最新JHA-for-rigging-work-JHY-Camp吊车作业.doc
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《最新JHA-for-rigging-work-JHY-Camp吊车作业.doc》由会员分享,可在线阅读,更多相关《最新JHA-for-rigging-work-JHY-Camp吊车作业.doc(16页珍藏版)》请在得力文库 - 分享文档赚钱的网站上搜索。
1、Four short words sum up what has lifted most successful individuals above the crowd: a little bit more.-author-dateJHA-for-rigging-work-JHY-Camp吊车作业Job Hazard Analysis WorksheetProject Title:Tsagaan Suvarga Copper Molybdenum ProjectDATE日期Customer:Mongolyn Alt (MAK) CorporationContract Title:General
2、earthworks and site preparation 场平和现场准备Contractor:Jiangsu Hengyuan International Engineering Co.,LtdContractor Number:161-0421Job Description 工作描绘(Brief Title)Work Area / EquipmentEarth Work一标Concrete二标Sequential JHA No.Rigging work for crane lifts吊车吊装JHY Camp宿舍区00000Rev Jan13Supervisor to confirm t
3、hat a HSE Risk Assessment has been completed for the scope of work?YESProceed with JHA继续进行作业危险性分析NODo not proceed with JHA and do not commence works不要继续进行作业危险性分析也不要开始作业Permits/Isolations作业票aEnergy Sources能源aHealth & Safety 健康和安全aEnvironmental环境 aPPEaHot WorkElectricalElevated Work高空作业aAir Pollution
4、(dust, fumes, gas)Glasses眼镜aConfined SpaceMechanicalMoving partsHarm to Flora or FaunaChemical GogglesExcavation / PenetrationManual ValvesMobile EquipmentNoise (plant & equipment)Face shieldWorking from Heights高空作业aPneumatics/PressureHazardous Flora or FaunaSpills to drains / waterwaysDust MasksAsb
5、estos RemovalChemicalsFireSpills to groundGloves手套aHigh VoltageHigh VoltageWorking AloneSoil erosion/qualityHarness安全带aElectrical AccessThermalLightingCommunityRespiratorWorking on Live EquipmentVibration/NoiseSimultaneous OperationsDisposable OverallsLand ClearanceGravitationalSlips/Trips/Falls滑,摔,
6、绊aSafety harness/fall安全带 arrestaBiologicalErgonomicsRadiationAir QualityHazardous Materials / Substances危险物体/材料(List any hazardous material to be used or present in the work area. Attach an MSDS for each): :列出要用的可能会造成危险的材料。贴上MSDS-Job Hazard AssessmentSTEPS步骤List the steps required to perform the tas
7、k in the sequence they are carried out按照执行顺序列明要求采取的步骤HAZARDS危险List the identified hazards that could cause injury/damage when the step is performed. 进行步骤的时候列明会造成伤害/损坏识别的风险CONTROLS控制List the current and future control measures required to eliminate or minimize the risk of injury/damage (use hierarchy
8、 of controls) 列出需要采取以消除或者最小化伤害/损坏的当前和未来控制措施(使用控制等级Using of crane / forklift.吊车,升降叉车Rigging/Liftingi.e. - Piping,管道- Structural结构- Mechanical,机械- Electrical,电器- Civil,土建- Scaffolding脚手架- Etc.等 - Unsafe rigging practices不安全吊装尝试- Defective rigging gears / lifting tackles.索具,装置不合格- Manoeuvring of equipm
9、ent.设备调动- Congestion of work area.工作区域堵塞- Lack of proper / adequate access通道不好- Personnel can be struck by the load during lifting / transporting.起吊,移动时人员可能被货物砸到- Personnel struck by moving equipment.人员被活动设备撞击- Damage to Property.财产损失- Sequence of work shall be discussed during daily pre-start meeti
10、ng before work commence. 每天晨会讨论工作顺序- Supervisor in-charge shall identify and restrict access to all pinch, crush and caught in between points.监工要负责闲杂人员禁止入内- Current color-coding inspection for all lifting equipment / devices to be used i.e. slings, shackles, spreader bars, etc.所有吊装设备设施都要进行颜色标码检查- Ce
11、rtified crane/forklift operator.司机必须要有驾照- If forklift to be used the length of the material shall not exceed 2.0 m on either side of the fork, spotter wearing orange vest with flag (red & green) and whistle shall accompany the forklift while travelling.升降叉车,物体不允许吊超过2米,旗手穿反光背心,红绿旗,口哨- Daily documente
12、d inspection of drivers /operators.司机每日吊车检查表- Current in-house monthly preventive maintenance inspection sticker当前内部月度维护检查表- Operating manual available (mobile heavy equipment).有操作手册- Only competent person (i.e. riggers) shall perform all rigging works.合格人员才能参与起吊工作- All lifting gears / tackles shall
13、 be inspected prior to use.在用之前,索具要统统检查- Tools in good operating condition / free of damage / defects. No improvised or home made tools allowed.所有工具都要状况良好,不允许临时工具,自制工具- Follow approved lifting plan / procedure.按照吊装计划程序来- Proper set up of crane. Outrigger on stable ground and with safe distance from
14、excavation edge (in case there is excavation near the lifting area.)吊车支脚要站在稳定的地面上,离开挖边缘安全距离- Provide safety signboards such as “lifting in progress: unauthorized person keeps away”. 提供安全标志牌“吊装进行中,无关人员禁止入内”- Use two tag lines to properly control the load. Proper hitch arrangement & provide softeners.
15、用用两根标志绳控制住货物- Area below the erection will be barricaded and restricted to all other personnel.吊装区域要隔离,无关人员禁止入内- Crane operating radius to be barricaded.吊车吊装半径范围隔离- PPE requirement must be strictly implemented. Complete PPEs for operators / drivers.所有人员都要PPE带齐- Christmas tree lifts are not permitted
16、. 不允许同时多根吊绳起吊- Rigger to sound whistle and crane operator the horn to warn people to clear the lifting area.旗手和司机鸣笛来告诉人们清空吊装区域- For tandem/tailing lift, should be coordinated between 2 cranes operators giving signal instructions from one rigger only.如果两台起吊,只允许一个旗手指挥- Carry out housekeeping/cleaning
17、before & after work. Proper materials/tools arrangement must promptly observe. 工作前后,保洁工作Rigging/LiftingDuring Night 夜间吊装- Unsafe rigging practices不安全的吊装测试- Defective rigging gears / lifting tackles.不合格吊装设备,索具- Manoeuvring of equipment.设备调动- Congestion of work area.工作区域堵塞- Lack of proper / adequate a
18、ccess通道堵塞- Personnel can be struck by the load during lifting / transporting.吊装,人员被货物撞击- Personnel struck by moving equipment.人员被移动设备撞击- Damage to Property.财产损失- Insufficient lighting不充分照明- Sequence of work shall be discussed during daily pre-start meeting before work commence. 每天晨会讨论工作顺序- Superviso
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 最新 JHA for rigging work JHY Camp 吊车 作业
![提示](https://www.deliwenku.com/images/bang_tan.gif)
限制150内