1、2022年-2023年建筑工程管理行业文档 齐鲁斌创作11.8.1 Generation (Generacin) 11.8.1 发电站(Generacin)11.8.1.1 Structure of the Section The Consultant reviewed thoroughly the main files comprising the “Generation” Section no. 2 of the FS prepared by CESEL Ingenieros mainly in November 2009 for Xxxxxx11.8.1.1 部分的结构 顾问仔细核查了构
2、成电站第二部分的主要文件,该关于FS文件主要由CESEL工程组在2009年11月为xxx准备的。 It shall be noted that the Market Study (Estudio Mercado) is included within the engineering section. Usually, this study forms part of a precedent section, where the basic project parameters, conditions and information is assessed and evaluated to di
3、stillate the input parameters for the subsequent sections of the FS. The sections are assessed and commented in detail in the subsequent subchapters. 这里需要指出的是市场研究(Estudio Mercado)也包含在工程部门里。通常,该项研究组成了包含前面的论述的一个部份,在这里,基本设计参数,条件和信息被组合在一起并取其精华部分录入后续的FS部分。该部分将会在后续章节里详细评估。11.8.1.2 Market Study (“Estudio M
4、ercado“) For LIs assessment comments on the Market Study please refer to Section 11.8.4. 11.8.1.2 市场研究(“Estudio Mercado”) 有关LI对于市场研究的评估请参阅条目11.8.411.8.1.3 Engineering (“Ingeniera”) The section “Engineering” (Item 2.2 “Ingeniera”) mainly contains technical specifications, equipment descriptions and e
5、quipment lists of the new Combined Cycle Power Plant. The section is structured into the following main subjects which are commented in the subsequent chapters:11.8.1.3 工程(“Ingeniera”) 该部分的工程(条目2.2 “Ingeniera”)主要包括新的联合循环动力装置的技术规格、设备说明和设备名录等。该部分将会放在后面章节的主体部分进行重点论述。* Engineering Thermal Power Plant (2
6、.2.1. Ingeniera Central Trmica);*工程热动力装置(工程热电) (2.2.1 Ingeniera Central Trmica);* Specifications of main equipment (2.2.2. Especificaciones Equipos Principales);*主要设备的参数(2.2.2Especificaciones Equipos Principales);* Desalination Plant (2.2.3. Planta Desalinizadora).*电站淡化站(2.2.3 Planta Desalinizadora)
7、. This section consists mainly of system descriptions (Memorias Descriptivas), technical specifications (Especificaciones Tcnicas), listing of components and drawings of the power island and the main plant systems of a Gas Turbine Combined Cycle Power Plant (CCGT). 该部分主要由系统规格(Memorias Descriptivas),
8、技术规格(Especificaciones Tcnicas),零部件和动力岛图纸以及涡轮机组电站(CCGT)的主体部分构成。11.8.1.3.1 Qualitative Assessment of Sections Content11.8.1.3.1 对各部分内容的定性评价11.8.1.3.1.1 Engineering Thermal Power Plant (2.2.1. Ingeniera Central Trmica)11.8.1.3.1.1工程热电 (2.2.111.8.1.1.1.1Ingeniera Central Trmica) This subsection consists
9、 of the subchapters Thermal Power Plant (“Central Trmica”), describing the Power Island and the projects Modules (“Modulos”) describing plant systems of the new thermal power plant, including the power island. The Consultant has made a thorough review of the Power Island documents and a comprehensiv
10、e review of the main documents contained in the subsection “Modules”. 本子部分在热电站(“Central Trmica”)的子章节里,描述了动力岛和包括动力岛及新热电站发电系统的项目模块(“Modulos”)。 顾问已经仔细的审核了动力岛的文件并综合审核了其包含的子单位模块的主要文件。 Thermal Power Plant “El Faro” (Central Trmica”El Faro”) 热电站中心供热“El Faro”(灯,照明)(Central Trmica“El Faro”) The main document
11、 contained in the subchapter Thermal Power Plant “Central Trmica” (Central Trmica “El Faro”; N 997601-800-EF-G-MD-001) prepared by CESEL Ingenieros in November 2009 for Xxxxxx discusses the different procurement approaches for the CCGT power plant (e.g. turn-key or lot-wise) and briefly describes th
12、e power island and the plant systems herein denominated “modules”.The report determines that a lot-wise procurement of the power plant shall be made: the power island as turn-key EPC contract and the necessary plant systems (modules) shall be procured lot-wise. It is assumed that the procurement and
13、 implementation coordination of all procurement packages will be made by a company under an EPC Management contract or similar. 主要文件包括在CESEL工程师们在2009年11月为xxxx探讨为CCGT电站实现不同途径的热电厂“Central Trmica”子章节(Central Trmica“El Faro”;N997601-800-EF-G-MD-001)中,(如交钥匙或分批交付,)并且简明的描述了动力岛和电站系统并以此命名的模块。报告决定分步骤交付电站会是这样:
14、动力岛以EPC交钥匙合同交付,其他必要的电站系统(模块)按次分批交付。这就假定所有取得的打包服务被同一个管理合约或类似的合约所约定,以实现在同等或相似条件下交付和履行合约。 The report lacks an analysis and discussion of the advantages and disadvantages of each presented procurement approach. It is hence not clear on which grounds CESEL has based the determination of the selected proc
15、urement approach. 该报告缺乏一份关于每一交付接受方式优缺点的分析和讨论。这样CESEL以什么方式作为选定交付的理由就不是很清晰。 In addition, in the reports introduction it is stated for the turn-key approach for the complete plant, that “ (). This option is generally considered when the Owner awards the plant operation to a third party.”. This misleadi
16、ng comment cannot be confirmed by the Consultant, does not reflect correct understanding of a turn-key procurement approach. Generally, the present document “Central Trmica ”El Faro” is only limited comprehensive and certain statements are misleading. The underlying methodology of the report is not
17、in accordance with common practice, since the justification (reasons, pros and cons) for the selection of the chosen procurement option is missing. 并且,在报告的介绍里,宣称以交钥匙方式为完成电站方案“()”。该选择一般是由受益人交托第三方进行操作时才考虑。这种容易引起误导的评论不应该由顾问做出,也不能正确反映出交钥匙方案的情况。 通常,现有文件的中心供热“El Faro”仅仅是有限综合这样的结论很容易误导别人。本报告所存的方法与共同实践并不一致,
18、并且对为什么选择该方案的原因,利弊及合理性等也没有做任何解释。It is assumed that SHOUGUESA will be the Owner of the power plant and establish a PPA with SHP for the power delivery. As per our knowledge there is no international precedent case were an IPP power project subdivided into procurement packages got non-recourse financin
19、g from international lenders. With the present project and equipment procurement and implementation set-up we consider it difficult that the Owner could raise funds from international lenders. 它假定SHOUGUESA在电站交付后将会是新电站的拥有者并和SHP一起建立PPA来实现电力传输。据我们所知,现在国际上尚未出现过IPP动力项目被分解为无追索权采购计划而取得国际债权人注资的先例。以现有的项目和设备采
20、购和开工方案我们认为电站拥有人可能需要增加国际债权人的融资。 It is recommended to update the report according to the findings provided in the above subchapter. 我们建议在上面的子章节的报告里更新新的发现。 The context of these documents with the main document dealing with the procurement set-ups for the plant is unclear and not explained. The two othe
21、r text documents contained in the subchapter “Central Trmica” are civil specifications for roads and a design specification on reinforced concrete and steel structures giving detailed advice on layout criteria, usually only found in detailed technical specifications of tender documents. In the latte
22、r document it is stated that the design criteria and mentioned standards are the basis for the development of the FS. 其他两篇文件正文包含的子章节“Central Trmica”是民用公路规格在设计标准上的详细高强度钢筋混凝土结构设计规格,通常该规格仅存在在投标文件的详细技术规格中。在后面的文档中它声称其设计标准和所用的标准是基于FS的发展而确定的。 这些论及获取电站设施的主体文件的上下文并不清晰而且没有更多的说明。Plant Modules (Modulos)电站模块(Mod
23、ulos) In the section “Modulos” the following power plant systems were specified by CESEL Ingenieros in November 2009 for Xxxxxx:a) Power island;b) Circulating water system;c) Water plant;d) Gas pressure reduction and measurement station;e) Diesel fuel storage;f) Black start system;g) Control system
24、and administration building;h) Step-up substation/transformer;i) Fire fighting system;j) Power plant access. 在模块“Modulos”部分,下列电站系统是由CESEL工程师在2009年11月为xxx制定的。a)动力岛;b)水循环系统;C)水站;d)气体降压和测量基站;e)柴油燃料仓库f)黑色启动系统g)控制系统和管理建筑;h)升压站/变压器i)消防系统j) 电站接入; These subsections of the FS were thoroughly assessed. Our co
25、mments are as follows: 这些FS子部分已经被仔细评估。我们的意见如下: a) Power IslandThis subsection consists of one main document on the power island, civil works drawings, I&C system specification and other drawings. Functional technical specifications of the power island components are not contained in this section 2.2
26、.1.A)动力岛 本子部分包含关于动力岛,民用工作制图 I&C 系统规格和其他图纸等主体文件。动力岛组成的功能技术规格并不包含在2.2.1部分。 The main document “Power Island” (N 997601-800-EF-G-MD-002-0) prepared by CESEL Ingenieros in November 2009 for Xxxxxx lists the main components of the plants power island (an itemised equipment list of a CCGT power island is a
27、nnexed to this document), plant configuration and optional plant items, operational data and some basic plant features. 由CESEL工程师在2009年11月为XXX所做的“动力岛”(N997601-800-EF-G-MD-002-0)主文件列举了电站动力岛的主体部分(CCGT动力岛设备清单也附加在本文件中),电站配置和可选电站项目,操作数据和一些基本的电站特征。 All data and technical descriptions are specified in deta
28、il and are based on a class F gas turbine in a 1 x 1 (GT STG) configuration, featuring a SCC6-5000F 1X1 Flex-Plant TM 30 product from SIEMENS, i.e. a combined cycle turnkey plant featuring a triple pressure HRSG with reheat. In section “2.4 Tamao y Localizacion“ CESEL stated that this SIEMENS plant
29、was mainly chosen for calculation and conceptual design of the plant systems and preparation of the plant systems specifications due to its high efficiency and the fact that the data base of General Electrics class F CCGT plant was not as complete as SIEMENS one at the time of preparation of the FS.
30、 所有的数据和技术规格被具体指定并基于西门子的1X1 (GT STG)的气体涡轮机的F等级配置, 以SCC6-5000F Flex-Plant TM 30产品为特征,如一种以三倍压力HRSG再供热-组合周期交钥匙电站。在“2.4尺寸和位置”部分,CESEL声明说这个西门子电站主要是为电站系统的规格计算和概念设计而设计的电站系统,在该电站并没有象同期FS所预备的西门子其他电站一样,而是为高效及大发电CCGTF级电站积累数据。 The document seems to be mainly composed by means of text parts of a SIEMENS offer (li
31、sting of optional equipment) and the results of SIEMENS performance calculation for the above mentioned SIEMENS CCGT product. 本文件看起来是主要由西门子提供的可选设备名单和西门子针对上述的西门子CCGT产品性能运算的文本部分构成。 This document is not a functional specification of the power island and should consequently not be located in this sectio
32、n. We recommend relocating this document to the section “2.4. Tama?o y Localizacion” where the technology and power island design is discussed and presented. 本文件不是动力岛的功能规格,因此不应该放在这一部分。我们推荐把这部分文件放在讨论技术和动力岛的“2.4 Tamao y Localizacin”部分。 An acceptable functional specification of the Power Islands main e
33、quipment is enclosed in directory “2.2.2 Especificaciones Equipos Principales”. A description of the required operation mode of the power island is however missing. 可被接受的动力岛主要设备的功能规格包含在目录2.2.2 主要设备参数(Especificaciones Equipos Principales)里。所需要的动力操作模式描述却缺失了。 The Power Island directory contains three s
34、ub-directories (civil; I&C; drawings) with the below mentioned documents and information. However, it is noted that all documents (drawings), except the I&C documents, are not really supporting the information contents of this section. 动力岛目录包含下面所讲述的三个子目录(民用,I&C和图纸)文件和信息。然而,除了I&C文件外的其他所有被记录的文件(图纸)并不真
35、正支持这部分的信息内容。 I&C: General design information and criteria of the control systems components. A description of the general I&C architecture of the entire plant including the power island, modules, sea water pump station and fuel storage farm is shown on a drawing included in this subsection. The I&C
36、architecture of SHPs (and/or Shougesas) existing I&C system and the integration of the new plants (new power plant and new production facilities) into the existing I&C scheme are not specified. I&C:总体设计信息和控制系统零部件的标准。对主要包含了动力岛,模块,海水抽水站和燃料储藏区等全体电站的总体I&C建筑描述,包括本子部分都表现图纸上。现存的I&C 系统的SHP(和/或Shougesa)的I&C建
37、筑和集成到现存I&C 计划的新电站(包括新电站和新的生产设施)的规格标准并没有被指定。 Drawings: Four CAD drawings showing GT layout, lay-down areas at site, main SLD and SLD of auxiliary systems. The drawings mainly show a detail of degree which is not common to elaborate for feasibility studies. 图纸:四份CAD图纸显示了GT布局,现场堆放区,主要SLD和SLD辅助系统。 图纸主要显
38、示并不人所周知的但精心进行的可行性研究程度的详情。b) All remaining Modules (items b. to j.) except Power IslandThe main documents of the following plant systems were comprehensively reviewed by the Consultant:The power plant systems (modules) were designed and specified in accordance with the determination of the Power Isla
39、nd being a NG operated 1x1 SIEMENS CCGT power plantb) 除动力岛外所有剩下的模块(items b to j) 顾问广泛审阅了以下电站系统的主要文件: 动力岛系统(模块)被设计和指定与NG操作的1x 1西门子CCGT电站相一致。 The BoP of the Gas Turbine Combined Cycle Power Plant (CCGT) is described in this section by means of system descriptions (Memorias Descriptivas), technical spe
40、cifications (Especificaciones Tcnicas), listing of components and drawings.The documents and the structure of the above mentioned plant system is very similar. 气体涡轮组合的循环电站(CCGT)的BoP在本部分通过系统描述(Memorias Descriptivas)、技术规格(Especificaciones Tcnicas),零部件清单和图纸等手段在进行了说明。 上面提到的电站系统的文件和结构非常相似。Each plant syst
41、em contains most of the following documents, which are briefly characterised and commented by the Consultant: 每个电站系统主要包括被顾问简明描述和评论的如下文件:1) System Description of the respective Main Plant System (Memoria Descriptiva; MD) The MDs consist mainly of a system description and brief functional specificatio
42、ns of the respective plant components, including description of interfaces (if any) and in few sections presentation of layout criteria. The MDs mention detailed equipment and system data (e.g. exact pipe diameters, pump capacities, flows, etc.) without mentioning the source of these data. 1 )各个主电站系
43、统(Memoria Descriptiva;MD)的系统描述 主电站的描述主要包含系统描述和各个电站的零部件简单的功能规格,包括接口描述(如果有)和少数布局部分介绍。主电站的描述详细描述了除这些数据的来源外其他设备和系统数据(如精确的管道尺寸,泵体容量,流体等)。 In some sections (e.g. circulating water system and desalination system) layout documents (“Memoria de Clculo”) are available. These documents contain figures matching
44、 with those of the “Memoria Descriptiva” of the respective system, but without any comment, which figure was finally chosen for the MD and without giving a justification for the selected figures. Such approach is not considered to be clear, self-explanatory and good engineering practice. It is not c
45、ommon and not necessary in FS to fix dimensions and designs down to the details. 在有些部分(如水循环系统和淡化系统)布局文件(“Memoria de Clculo”)是有效的。这些文件包括与各自系统那些描述记忆“Memoria Descriptiva”相匹配的数字,但是对于哪个数字最后为MD选择及为选出的数字所给出理由没有给予任何评论。这样的方法并不被认为是清楚的,不需加以说明的和好的工程实践。在FS里去具体地校准度量和设计来说这并不普遍和必需。 As presented in the above discuss
46、ed document “Central Trmica “El Faro”, CESEL has divided all plant systems and equipments into separate procurement packages which shall be procured from different suppliers. In the MDs these packages are identified with “EP+current number” (EP4 means for example “proveedor designado como EP4”; Engi
47、neering & Procurement 4). A good overview on the different procurement packages is given in the MS-Project time schedule enclosed in Section 2.8 “Cronograma” of the FS. 在上面文件里所论述的中央供热“Central Trmica“El Faro”中,CESEL将所有电站系统和设备划分为由不同供应商分开提供的打包项目。在主电站的描述里这些打包项目被确认为“EP+现有数字”(EP4的意思是例如象EP4那样设定好的供应商(“proveedor designado)”;工程及交付 4 )在不同的采购方式的概括在包括在2.8部分FS的时间表“Cronograma ”中所附的 MS项目时间表里。 Such split-up of systems down to small equipment units and exact determination of equipment for procurement purposes is mainly known from the procurement approach of an Architect Engineer, who exactly determ