1、新希望加尔各答动物饲料私人New Hope Kolkata Animal Feed Private Limited年产26万吨饲料加工工程Annual output of 2,60,000 tons of feed processing project施工合同 The Construction Agreement合同编:NHKTJ2021033001 (土建工程) Agreement No.:NHKTJ2021033001 (Civil works) Agreement award date:May 7th, 2021 第一部 协 议 书Part One The Agreement发包人全称:
2、新希望加尔各答动物饲料私人(以下简称甲方)The Employer (full name) : New Hope Kolkata Animal Feed Private Limited (Hereinafter referred to as First Second Party) 承包人全称:印度朴实建筑开展私人(以下简称乙方 The Contractor (full name): Pushy Construction and development India Pvt Ltd. (Hereinafter referred to as Second Party)按照印度其他有关法律、行政法规遵
3、循平等、自愿、公平和老实信誉的原那么双方就本建立工程施工事项协商一致订立本合同。In accordance with relevant laws, administrative rules and regulations in India, based on the principle of equality, voluntariness, fairness, honesty and credit, the two parties conclude the following Agreement on negotiated consensus of the construction items
4、 on this construction project. 一、 工程概况 The Project Overview工程名称: 新希望加尔各答动物饲料私人年产26万吨饲料厂工程土建工程Project Name: Annual output of 2,60,000 tons of feed processing projects for New Hope Kolkata Animal Feed Private Limited (civil works)工程地点: 印度西孟加拉邦奈哈蒂工业园 The address of the project: Plot-A5, Rishi Bankim Sh
5、ilpaudyan, PS-Naihati, North 24 Parganas, West Bengal, PIN-743165工程立项批准或核准、备案文: 西孟邦工厂第2313/01/2021 Formality: No. 23 of year 2021, Directorate of Factories of West Bengal (13/01/2021)资金来源:发包方企业自筹已到位Capital source: Rasied by First Party (In place)工程内容: 承包人按照施工图及甲乙双方的合同约定对主车间、成品车间、原料车间、雨棚一、锅炉房、卸料棚、发电机
6、房、水泵房、综合楼、门卫、磅房、食堂、浴室、箱变、筒仓根底、的土建、装饰、给排水、电气、消防、总平道路工程等图纸内容等分项工程。Contents of the project: The Contractor undertake the following sectional works in accordance with the construction drawing and the agreement of the contract: the civil engineering and other engineering including decoration, water sply
7、and drainage, electric, fire protection and the whole flat road for the main workshop, finished products warehouse, raw materials workshop, canopy, boiler room, unloading shed, generator room, water pump room, plex building, guard room, pound room, canteen, the bathroom, the box-type transformer, th
8、e silo foundation, the floor scale and so on , whi are specified in the drawings.二、工程承包范围 Scope of the project contracting 1、承包范围:主车间:包括土建、装饰、电气工程、给排水工程、消防工程;成品车间:包括土建、装饰、电气工程、给排水工程、消防工程;原料车间:包括土建、装饰、电气工程、给排水工程、消防工程;雨棚、锅炉房:包括土建、装饰、电气工程、给排水工程、消防工程;卸料棚:包括土建、装饰、电气工程;发电机房、水泵房:包括土建、装饰、电气工程、给排水工程、消防工程;综合楼
9、:包括土建、装饰、电气工程、给排水工程、消防工程;门卫、磅房:包括土建、装饰、电气工程、给排水工程、消防工程;食堂:包括土建、装饰、电气工程、给排水工程、消防工程;浴室:包括土建、装饰、电气工程、给排水工程、消防工程;箱变:包括土建、装饰、电气工程、给排水工程、消防工程;筒仓根底:包括土建、电气工程防雷与接地;:包括土建工程;总平:包括道路、总平给排水、总平电气、总平消防等图纸分项内容。Agreement scope: The main workshop: including civil, decoration, electrical, water sply and drainage and
10、fire engineering; the finished products warehouse: including civil, decoration, electrical, water sply and drainage and fire engineering ; the raw materials warehouse: including civil, decoration, electrical, water sply and drainage and fire engineering; the boiler rooms and canopy: including civil,
11、 decoration, electrical, water sply and drainage and fire engineering; the unloading shed: including civil, decoration and electrical engineering; the generator room and the pump room: including civil, decoration, electrical, water sply and drainage and fire engineering; the plex building: including
12、 civil, decoration, electrical, water sply and drainage and fire engineering; the guard room and the pound room: including civil, decoration, electrical, water sply and drainage and fire engineering; the canteen: including civil, decoration, electrical, water sply and drainage and fire engineering;
13、the bathroom: including civil, decoration, electrical, water sply and drainage and fire engineering; the box-type transformer room: including civil, decoration, electrical, water sply and drainage and fire engineering; the silo foundation: including civil and electrical(lightning protection and grou
14、nding )engineering; the floor scale: including civil engineering; the total flat: including roads, water sply and drainage , electrical and fire engineering , etc. , whi are specified in the drawings.2、甲方安排的小型或零星类工程将以签订?合同补充协议?附件7的方式计算价款其费用按照甲方总部核定的价格协商执行乙方不得以任何理由回绝施工或进步造价;The cost of any additional
15、 sporadic or all works arranged by First party will be calculated according to the Agreement splementary agreement (appendix 7) signed by two parties, and its price will be performed under negotiation whi is approved by the headquarters of Part A. Second Party shall not refuse to construct or raise
16、the cost for any reason. 3、承包方式:双包包括并不限于包工、包料、包工、包质量、包资料 (书面资料及资料)、包括图纸规定范围内的施工措施、包平安文明施工、包施工现场屡次驳运、包现场成品保护、包已完工建筑保护、包垃圾清运至政要求的地方、包理、包临时设施等。(不包含场外弃土及垃圾)Contracting way: including but not limited to labor, materials, time limit, quality, documents (both soft and hard copies), construction procedure t
17、hat specified in the drawings, safe and civilized construction measures, the construction site transfer, the protection of pleted buildings and finished products, refuse cleared to a region of the municipal requirements, management and orary facilities, etc. (not including discarding the soil and th
18、e garbage beyond the site)三、合同工 Agreement duration合同工:总有工360天。Agreement duration: Total duration is 360 days.材料准备开工日为2021年4月5日;进场开工日为2021年5月7日以甲方正式的开工时间为准主车间根底完成且到达钢构造入场安装条件时间为2021年7月30日;开工日为2021年5月2日需要特殊说明的是因不可抗力等因素如当地大选除外或者连续下雨8小时工可以适当顺延顺间由甲方根据实际情况定顺延间误工费等所有费用均用由乙方自行承担;The mencement date for mater
19、ial preparation is April 5th, 2021; the mencement date for starting work is May 7th, 2021 (subjected to the First Party s formal work-start time ); the finished time for the main workshops foundation is July 30th, 2021 and in the meantime the site condition shall meet the requirement of steel constr
20、uction installation; the pletion date is May 2nd, 2021. There is a special instruction that the time limit may be appropriately postpone due to force de majeure, su as State election or Eight hours continuous rain. The postpone time is confirmed by First Party according to the actual situation, and
21、all the expenses incurred because of the delays shall be borne by Second Party. 工程质量:一次性验收合格。按印度工程质量验收到达备案合格。本工程土建开工资料由土建承包进展钢构造施工资料由钢构造进展资料由各施工自行负责交由土建汇总后交由甲方保存。Standard of engineering quality: One-time acceptance. (reaing the standard for record according to the Indian engineering quality acceptan
22、ce standard). As-built documents for the civil works should be done by the civil works Contractor, accordingly as-built documents for steel fabrication works should be done by the steel fabrication works Contractor. All the documents should be collected and submitted to First party by the civil work
23、s Contractor after ea Contractor submit their documents to the civil works Contractor.五、合同价款 Agreement price1、合同金额大写:合同范围内总承包价:贰亿柒仟陆佰陆拾万卢比整。小写:合同范围内总承包价:INR27,66,00,000.00。The Agreement sum (in s): Total contracting sum within the Agreement scope: Rees Two Hundred Seventy Six Million Six Hundred Tho
24、usand Only. The Agreement sum (in number): Total contracting sum within the Agreement scope: INR27,66,00,000.00. 此承包价为图纸土建范围内所有工程量包干价假设图纸无修改、无设计变更及工程承包内容内增减那么合同总价一次包干不作调整。如图纸设计中无做法与详图及材料要求的无法报价项那么不在包干范围内包括但不限于厂区绿化工程厂区大门办公楼区域围栏等.The Agreement sum is a lump price including all the civil works in the t